What are DORA metrics?

DORA metrics are five software delivery measures from the DORA (DevOps Research and Assessment) programme: change lead time, deployment frequency, failed deployment recovery time, change fail rate and deployment rework rate.

Also called DORA four keys, four key metrics, DevOps metrics, software delivery performance metricsUpdated

DORA stands for DevOps Research and Assessment, a research programme that began with the 2014 State of DevOps study and joined Google Cloud in December 2018. Its annual surveys link a team's delivery performance to how the organisation performs. The metrics it uses to measure delivery are called DORA metrics.

This page is about the DevOps metrics. The EU's Digital Operational Resilience Act is also called DORA. For that regulation, see DORA (Digital Operational Resilience Act).

The five DORA metrics

DORA's current guidance on dora.dev uses five metrics in two groups.

Throughput

  1. Change lead time: time from a commit to that change running in production.
  2. Deployment frequency: how often changes are deployed, or the time between deployments.
  3. Failed deployment recovery time: time to recover from a deployment that fails and needs immediate intervention.

Instability

  1. Change fail rate: the share of deployments that need immediate intervention, usually a rollback or a hotfix.
  2. Deployment rework rate: the share of deployments that are unplanned and happen because of an incident in production.

DORA's research has found repeatedly that speed and stability go together. Top performers do well on all five, and low performers do poorly on all five.

How the metrics changed

Many articles still list the "four keys". The set has changed:

  • 2014 to 2015: deployment frequency, lead time for changes, mean time to recover (MTTR) and change fail rate.
  • 2018 and 2021: DORA added availability, later broadened to reliability, as a measure of operational performance. DORA now says this was never a fifth delivery metric.
  • 2023: MTTR ("time to restore service") was replaced by failed deployment recovery time, which counts only failures caused by a change, not external outages.
  • 2024: deployment rework rate was added as the fifth delivery metric.

If a vendor dashboard shows "time to restore" from all incidents, it is measuring the older definition.

Example: one service, one month

A team running a lending API records this in October:

Metric Data Result
Deployment frequency 40 production deployments About 2 per working day
Change lead time Median commit-to-production time 1.5 days
Change fail rate 3 deployments rolled back or hotfixed 7.5%
Failed deployment recovery time Median time to recover those 3 45 minutes
Deployment rework rate 4 unplanned deployments to fix production incidents 10%

The team's biggest delay is code review waiting time, which accounts for most of the 1.5 days. Smaller pull requests would shorten it and reduce the size of each change, which DORA says helps both throughput and stability.

The data usually comes from Git, the CI/CD system and the incident tool. Start with rough numbers from a conversation or the DORA Quick Check before building integrations.

Common pitfalls

DORA itself warns against several of these:

  • Turning a metric into a target, such as "every team deploys daily by year end". Teams then game it, for example by splitting one change into many deployments.
  • Comparing unlike systems, such as a mobile app with a mainframe. The metrics are meant per application or service.
  • Using one metric alone. Deployment frequency rising while change fail rate rises too is not progress.
  • Ranking teams against each other instead of tracking each team's improvement over time.

For outsourced teams, the metrics make a fair basis for reporting. See KPIs and SLAs for outsourced development, or our product engineering work.

Any idea in mind? Let's make it real.

Tell us what you're building. You'll hear back from an engineer, not a sales team, usually within one working day.

Book a 30-min call