Filling in the scorecard
The scorecard starts with three vendors. Click a name to rename it, use + to add a vendor (up to five) and × to remove one. Score each vendor on each criterion from 1 to 5, where 1 is poor, 3 is acceptable and 5 is excellent. Click a score again to clear it.
Each criterion has a weight from 0 to 50. Your scores and weights are saved in this browser only, and nothing is sent to us. Excel / Sheets (CSV) downloads the table with weights, scores and totals. Print or PDF gives you a copy for a decision meeting. Reset clears everything and restores the default weights.
The ten criteria
The default weights add up to 100. Technical quality carries the most, because it is the hardest thing to fix after you sign.
| Criterion | Default weight | What to look for |
|---|---|---|
| Technical quality | 15 | Code samples, clear answers on architecture, and the result of a paid trial task |
| Relevant experience | 10 | Similar products, domain and scale, plus regulated work if you need it |
| Team seniority and stability | 10 | The named people who will work on your project, and how long people stay |
| Delivery process and visibility | 10 | Sprint cadence, demos, and your access to the board, repository and builds |
| Communication and overlap | 10 | Clear writing, quick replies and shared working hours |
| Quality engineering | 10 | Automated tests, code review, CI and a written definition of done |
| Security and compliance | 10 | Access control, device policy, ISO 27001 or SOC 2, and data handling |
| References | 10 | Calls with two or more clients on similar work |
| Commercial fit | 10 | Price against scope, the engagement model and payment terms |
| Contract terms | 5 | IP assignment, exit and handover, warranty and liability |
Contract terms carry a low weight because the basics belong in the gates below.
How the totals are calculated
For each criterion the scorecard takes the weight × (score ÷ 5). It adds these points across all ten criteria, divides by the total of the weights and multiplies by 100. The result is a score out of 100, rounded to one decimal place.
Take a vendor that scores 5 on technical quality and 3 on everything else. Technical quality gives 15 points. Each of the other nine criteria gives three fifths of its weight, which adds up to 51 points. The total is 66 out of 100.
A blank criterion counts as zero, so a vendor you haven't finished scoring looks weaker than it is. The footer shows progress, such as "7/10 scored", until every row is filled. Once a vendor is complete, the highest total is marked "Highest".
If your weights don't add up to 100, the score is still out of 100 because it divides by the weight total. The scorecard flags it anyway, since round numbers are easier to explain to colleagues.
Gates to apply before scoring
Some requirements aren't trade-offs. Check these as pass or fail first and drop any vendor that fails:
- IP assignment. The contract assigns all code, designs and documents to you once paid. See IP ownership when outsourcing.
- Your accounts, from day one. Code lives in your repository and runs in your cloud accounts, or moves there on request.
- Security basics. Named accounts with multi-factor authentication, encrypted laptops, access removed when people leave and no client data on personal devices. Send the vendor security questionnaire to every shortlisted vendor.
- Data protection. If the work involves personal data, the vendor will sign a data processing agreement under the law that applies to you, such as the GDPR or India's Digital Personal Data Protection Act, 2023.
- A clear exit. You can end the contract with reasonable notice and get a documented handover.
Running a fair evaluation
Four habits make the scores comparable:
- Ask every vendor the same questions. Send one brief and one set of questions, and give everyone the same deadline. Our RFP template gives you a structure.
- Score independently. Ask two or three people to score alone before anyone discusses the vendors. Each person fills in the scorecard in their own browser and exports the CSV. Combine the files in a spreadsheet, and talk through any criterion where scores differ by two points or more.
- Run a paid trial task. Give the top two or three vendors a small, real piece of work lasting a few days, and pay for it. Ask for the people who would join your team. It gives the best evidence for technical quality, communication and process.
- Call references yourself. Speak to at least two clients on similar work. Ask what went wrong, how the vendor handled it and whether they would hire them again.
Write a one-line reason next to each score.
Adjusting the weights for your project
Set the weights before you read any proposals. Changing them afterwards tends to favour the vendor you already like. Some starting points:
- Regulated products in finance or health: raise security and compliance, and relevant experience. Take the points from commercial fit.
- An early MVP: raise technical quality and communication. Domain experience matters less when the product is still changing.
- A long-term dedicated team or staff augmentation: raise team seniority and stability, and communication and overlap. Check shared hours with the time zone overlap calculator.
- Replacing a vendor: raise delivery process and visibility, quality engineering and contract terms. Our guide to switching vendors explains why.
Treat totals within a few points of each other as a tie, and decide on the trial task and reference calls. Then agree scope and acceptance criteria in a statement of work. If you'd like Indi on your shortlist, contact us.