Vendor evaluation scorecard

Compare software development vendors with a weighted scorecard. Score up to five vendors on ten criteria, change the weights and export it to a spreadsheet.

FreeNo sign-upUpdated

Score each vendor from 1 (poor) to 5 (excellent)

Criterion

Weight

Technical qualityCode samples, architecture answers, a paid trial task
Relevant experienceSimilar products, domain and scale; regulated work if you need it
Team seniority and stabilityWho actually works on your project, and how long they stay
Delivery process and visibilitySprint cadence, demos, access to the board, repository and builds
Communication and overlapWritten clarity, responsiveness, shared working hours
Quality engineeringAutomated tests, code review, CI, definition of done
Security and complianceAccess control, device policy, ISO 27001 or SOC 2, data handling
ReferencesCalls with two or more clients on similar work
Commercial fitPrice against scope, engagement model, payment terms
Contract termsIP assignment, exit and handover, warranty, liability
Weighted scoreWeights add up to 100

0 /100

0/10 scored

0 /100

0/10 scored

0 /100

0/10 scored

Click a score again to clear it. Your scores are saved in this browser only. Nothing is sent to us.

Filling in the scorecard

The scorecard starts with three vendors. Click a name to rename it, use + to add a vendor (up to five) and × to remove one. Score each vendor on each criterion from 1 to 5, where 1 is poor, 3 is acceptable and 5 is excellent. Click a score again to clear it.

Each criterion has a weight from 0 to 50. Your scores and weights are saved in this browser only, and nothing is sent to us. Excel / Sheets (CSV) downloads the table with weights, scores and totals. Print or PDF gives you a copy for a decision meeting. Reset clears everything and restores the default weights.

The ten criteria

The default weights add up to 100. Technical quality carries the most, because it is the hardest thing to fix after you sign.

Criterion Default weight What to look for
Technical quality 15 Code samples, clear answers on architecture, and the result of a paid trial task
Relevant experience 10 Similar products, domain and scale, plus regulated work if you need it
Team seniority and stability 10 The named people who will work on your project, and how long people stay
Delivery process and visibility 10 Sprint cadence, demos, and your access to the board, repository and builds
Communication and overlap 10 Clear writing, quick replies and shared working hours
Quality engineering 10 Automated tests, code review, CI and a written definition of done
Security and compliance 10 Access control, device policy, ISO 27001 or SOC 2, and data handling
References 10 Calls with two or more clients on similar work
Commercial fit 10 Price against scope, the engagement model and payment terms
Contract terms 5 IP assignment, exit and handover, warranty and liability

Contract terms carry a low weight because the basics belong in the gates below.

How the totals are calculated

For each criterion the scorecard takes the weight × (score ÷ 5). It adds these points across all ten criteria, divides by the total of the weights and multiplies by 100. The result is a score out of 100, rounded to one decimal place.

Take a vendor that scores 5 on technical quality and 3 on everything else. Technical quality gives 15 points. Each of the other nine criteria gives three fifths of its weight, which adds up to 51 points. The total is 66 out of 100.

A blank criterion counts as zero, so a vendor you haven't finished scoring looks weaker than it is. The footer shows progress, such as "7/10 scored", until every row is filled. Once a vendor is complete, the highest total is marked "Highest".

If your weights don't add up to 100, the score is still out of 100 because it divides by the weight total. The scorecard flags it anyway, since round numbers are easier to explain to colleagues.

Gates to apply before scoring

Some requirements aren't trade-offs. Check these as pass or fail first and drop any vendor that fails:

  • IP assignment. The contract assigns all code, designs and documents to you once paid. See IP ownership when outsourcing.
  • Your accounts, from day one. Code lives in your repository and runs in your cloud accounts, or moves there on request.
  • Security basics. Named accounts with multi-factor authentication, encrypted laptops, access removed when people leave and no client data on personal devices. Send the vendor security questionnaire to every shortlisted vendor.
  • Data protection. If the work involves personal data, the vendor will sign a data processing agreement under the law that applies to you, such as the GDPR or India's Digital Personal Data Protection Act, 2023.
  • A clear exit. You can end the contract with reasonable notice and get a documented handover.

Running a fair evaluation

Four habits make the scores comparable:

  1. Ask every vendor the same questions. Send one brief and one set of questions, and give everyone the same deadline. Our RFP template gives you a structure.
  2. Score independently. Ask two or three people to score alone before anyone discusses the vendors. Each person fills in the scorecard in their own browser and exports the CSV. Combine the files in a spreadsheet, and talk through any criterion where scores differ by two points or more.
  3. Run a paid trial task. Give the top two or three vendors a small, real piece of work lasting a few days, and pay for it. Ask for the people who would join your team. It gives the best evidence for technical quality, communication and process.
  4. Call references yourself. Speak to at least two clients on similar work. Ask what went wrong, how the vendor handled it and whether they would hire them again.

Write a one-line reason next to each score.

Adjusting the weights for your project

Set the weights before you read any proposals. Changing them afterwards tends to favour the vendor you already like. Some starting points:

  • Regulated products in finance or health: raise security and compliance, and relevant experience. Take the points from commercial fit.
  • An early MVP: raise technical quality and communication. Domain experience matters less when the product is still changing.
  • A long-term dedicated team or staff augmentation: raise team seniority and stability, and communication and overlap. Check shared hours with the time zone overlap calculator.
  • Replacing a vendor: raise delivery process and visibility, quality engineering and contract terms. Our guide to switching vendors explains why.

Treat totals within a few points of each other as a tie, and decide on the trial task and reference calls. Then agree scope and acceptance criteria in a statement of work. If you'd like Indi on your shortlist, contact us.

Questions and answers.

Three to five is enough for most projects. The scorecard holds up to five.

Rarely. Weak engineering at a low price costs more once you count rework and delays. Keep commercial fit at about the default weight and use it to separate vendors of similar quality.

Treat it as a tie. Run a paid trial task with both, or hold a second round of reference calls, and decide on that evidence.

Each person scores in their own browser, because scores are saved locally. Export each copy as CSV and combine them in a spreadsheet.

No. The score divides by the weight total, so it stays out of 100. A total of 100 is easier to explain, so the scorecard flags any other total.

Any idea in mind? Let's make it real.

Tell us what you're building. You'll hear back from an engineer, not a sales team, usually within one working day.

Book a 30-min call