App cost estimator

Estimate what your web or mobile app will cost to build. Pick a platform, design level and features to get hours, a timeline and costs in India, the UK and US.

FreeNo sign-upUpdated

1 · Platform
2 · Design

3 · Features

Accounts
Commerce and bookings
Engagement
Data and integrations
Admin and quality

Estimate · India team

$9,000 – $27,000

Effort
300–570 h
Timeline
6–9 weeks

2 developers, a QA engineer and a part-time project manager.

Show where the hours go
  • Build210–410 h
  • Design20–40 h
  • Testing40–80 h
  • Project management20–40 h

Same scope elsewhere

  • India$9,000 – $27,000
  • Eastern Europe$16,000 – $44,000
  • United Kingdom$31,000 – $89,000
  • United States$39,000 – $115,000

Planning range from 4 features and market rates as of November 2026. Not a quote. Your choices are saved in this browser.

How to use the estimator

  1. Choose the platform. A web app runs in any browser. "iOS + Android" means one cross-platform codebase in Flutter or React Native, which is what most new apps use. Native means separate Swift and Kotlin apps.
  2. Choose the design level. If you already have finished designs, developers build from them. A standard UI uses a proven component kit with your colours and logo. Custom design includes user research, a visual identity in the product and a small design system.
  3. Tick the features for your first release. Be strict. Every feature you add here adds weeks, and most products launch with fewer features than the first list.

The result updates as you go. Use Share link to send the exact estimate to a colleague, or Get a written estimate to send it to us with your notes.

How the estimate is worked out

The estimator uses the same planning ranges we use in early conversations with clients. Nothing is hidden, so you can check the logic:

Part How it's calculated
Features Each feature has a backend range and a screens range in hours, for one codebase
Platform Screen hours are multiplied: web or one platform ×1, cross-platform iOS + Android ×1.15, native iOS + Android ×1.9, web + mobile ×2
Setup 40–80 hours for architecture, environments, CI/CD and deployment. Mobile apps add 16–32 hours for store accounts, review and release builds
Design 0%, 10% or 18% of build hours, depending on the design level
Testing 20% of build hours for manual and automated testing
Project management 10% of build and design hours
Cost Hours × a blend of mid-level and senior hourly rates for each region
Timeline Two weeks of discovery, then the hours spread across the team at about 24 productive hours per person per week

For India, the blend uses mid-level rates of $25–40 and senior rates of $35–55 an hour. The UK and US figures use the same method with local rates. All rates come from the same data as our cost guides, last updated in November 2026.

What the number doesn't include

A planning estimate is only as good as the scope behind it. These items move real projects the most, and the estimator can't see them:

  • Integrations with older systems. A clean, documented API takes days. A legacy ERP with no sandbox can take weeks.
  • Regulation. Payments, lending, health and children's data bring extra work on consent, audit logs, data storage and security testing. See our FinTech and healthcare cost guides.
  • Data migration from an existing product.
  • Running costs after launch: hosting, third-party services and maintenance, which usually runs at 15–25% of the build cost each year.
  • Changes during the build. Some change is healthy. Keep 15–20% of the budget for what you learn.

Turning the estimate into a plan

Use the range, not the midpoint. If the top of the range is more than you can spend, remove features rather than hoping for the low end. Our MVP scope checklist helps decide what goes in the first release.

When you're ready to talk to vendors, put the scope into our RFP template and compare replies with the vendor evaluation scorecard. A good vendor will challenge your feature list and explain where their estimate differs from this one.

Questions and answers.

It's a planning range for budgeting and early vendor conversations, not a quote. It is least reliable for products with heavy integrations, regulated data or unusual technology. A one- or two-week discovery phase, ending in a written scope, is the normal way to narrow it.

Flutter and React Native share one codebase across iOS and Android, so most screens are built once. The estimator adds 15% for platform-specific work and testing on both. Native apps need two codebases, so screen work almost doubles.

Hourly rates for experienced engineers in India are lower than in the UK or US, while the work and tools are the same. The difference shrinks if communication is poor or the team is junior, so judge vendors on quality first. Our India vs US and UK cost comparison covers this in detail.

No. It covers design, build, testing and project management up to launch. Hosting for a new app is often small at first, and ongoing maintenance is usually budgeted separately each year.

Not directly. A fixed price needs a written scope with acceptance criteria. Send us the estimate with Get a written estimate and we'll reply with questions, then a scope and price.

Any idea in mind? Let's make it real.

Tell us what you're building. You'll hear back from an engineer, not a sales team, usually within one working day.

Book a 30-min call