Cloud migrations are often sold as cost savings. Sometimes they are. Often the first cloud bill is higher than the old data centre, because applications were moved as they were, oversized and always on. A good migration plans both the move and the running cost.
Ranges are typical for a capable Indian partner as of November 2026, for planning only.
Cost by size
| Size | Typical scope | Migration cost | Timeline |
|---|---|---|---|
| Small | A few applications and databases, simple networking | $10,000–35,000 | 4–10 weeks |
| Medium | 10–30 applications, several databases, integrations, staging and production, compliance needs | $35,000–120,000 | 3–6 months |
| Large | Many applications, legacy systems, strict uptime, data centre exit, regulated data | $120,000–500,000+ | 6–18 months |
Approaches and their cost
| Approach | What it means | Cost now | Cost later |
|---|---|---|---|
| Rehost (lift and shift) | Move servers as they are to cloud VMs | Lowest | Often highest running cost |
| Replatform | Small changes: managed databases, containers, load balancers | Moderate | Lower running cost, less maintenance |
| Refactor | Redesign for cloud services (serverless, managed queues) | Highest | Lowest running cost, best scalability |
| Retire or replace | Switch off unused apps; replace some with SaaS | Low | Lowest |
Most migrations mix all four. An assessment first decides which applies to each application.
What's included
- discovery and assessment of applications, dependencies and data
- landing zone: accounts, networking, identity, security baselines and logging
- infrastructure as code for all environments
- data migration with minimal downtime
- testing, cutover and rollback plans
- monitoring and cost controls
- documentation and handover
Hidden costs to plan for
- running both environments during the transition
- data transfer charges
- licences: some software licences cost more in the cloud; check bring-your-own-licence options
- training your team
- re-certification for compliance (PCI, ISO, SOC 2)
Keeping cloud bills low after migration
Right-size instances, use autoscaling, commit to savings plans for steady workloads, shut down non-production at night, and set budgets and alerts (see AWS costs for startups). For regulated Indian data, keep everything in Indian regions (see AWS vs GCP vs Azure in India).
Summary
Small migrations typically cost $10,000–35,000, medium $35,000–120,000 and large programmes $120,000–500,000+. Choose the approach per application, and plan running costs as carefully as the move.