What is OEE (overall equipment effectiveness)?

OEE (overall equipment effectiveness) is the share of planned production time that is truly productive. It is calculated as Availability × Performance × Quality, so 100% means only good parts, at full speed, with no stops.

Also called overall equipment effectivenessUpdated

OEE, or overall equipment effectiveness, answers one question about a machine or line: of the time it was meant to be producing, how much produced good parts at the right speed? It comes from Total Productive Maintenance (TPM), the maintenance approach associated with Seiichi Nakajima in Japan, and is now a common headline metric on shop floors.

The OEE formula

OEE = Availability × Performance × Quality

  • Availability = run time ÷ planned production time. It captures stops: breakdowns, changeovers, waiting for material.
  • Performance = (ideal cycle time × total count) ÷ run time. It captures running slower than the ideal and short stops nobody logs.
  • Quality = good count ÷ total count. It captures scrap and rework. Multiplied together, the three reduce to one simpler formula: OEE = (good count × ideal cycle time) ÷ planned production time.

Worked example: one shift on a press

Input Value
Shift length 480 min
Planned break 30 min
Planned production time 450 min
Unplanned downtime (die change overran, coil jam) 45 min
Run time 405 min
Ideal cycle time 30 s per part
Total parts made 729
Good parts 700
  • Availability = 405 ÷ 450 = 90.0%
  • Performance = (30 s × 729) ÷ (405 × 60 s) = 21,870 ÷ 24,300 = 90.0%
  • Quality = 700 ÷ 729 = 96.0%
  • OEE = 0.900 × 0.900 × 0.960 = 77.8% Check: 700 good parts × 30 s = 21,000 s of truly productive time, out of 27,000 s planned. That is 77.8%. The three factors point to different fixes. Here, availability and performance cost about the same. Quality losses are smaller, but each rejected part also wasted material.

The six big losses

TPM groups lost time into six categories, two for each factor:

  • Availability: breakdowns, and setups and adjustments
  • Performance: small stops, and reduced speed
  • Quality: startup rejects, and production rejects Reason codes for stops should map to these, so the OEE number leads to an action.

What is a good OEE score?

An OEE of 85% is often called "world class". The figure is usually traced to Nakajima's TPM work, as the product of about 90% availability, 95% performance and 99% or better quality. It is a reference point for discrete, repetitive production, not a fair target for every process. Compare a line with its own history first. TEEP (total effective equipment performance) goes one step further. It multiplies OEE by utilisation, the share of all calendar time that was planned for production.

Common mistakes

  • Using a slow "standard" cycle time instead of the true ideal. Performance can then exceed 100%.
  • Leaving changeovers out of planned time, which hides the biggest availability loss.
  • Entering counts by hand at shift end. Automatic counts from the PLC, collected over OPC UA or MQTT, are more reliable.
  • Comparing OEE across very different machines, or using it to rank operators. Many plants start with OEE from machine connectivity before a full MES. See our manufacturing industry outlook or our manufacturing work.