Predictive maintenance means deciding when to service a machine from evidence about its condition, not from the calendar. Sensors track signs of wear such as vibration, temperature, motor current or oil quality. Software watches for the changes that come before a failure, so the team can fix the part in a planned stop instead of an unplanned breakdown.

Predictive vs preventive maintenance

Approach When work happens Trade-off
Reactive After it breaks No planning cost, but the most downtime and damage
Preventive On a fixed schedule, such as every 2,000 hours Predictable, but replaces many parts that had life left
Condition-based When a measurement crosses a set limit Needs sensors and agreed limits
Predictive When a trend or model shows failure is approaching Needs good data, failure history and analysis
Condition-based and predictive maintenance overlap. The difference is that predictive tries to estimate how long is left, not only whether a limit is crossed. ISO 17359 gives general guidelines for setting up a condition monitoring programme for machines.

What it needs

  • Signals that show wear early. Vibration for bearings, gearboxes and imbalance. Temperature for electrical connections and bearings. Current for motors and pumps. Oil analysis for gearboxes and hydraulics.
  • Data collection from sensors or PLCs, usually through an IIoT gateway and MQTT or OPC UA, stored as time series.
  • Context: which machine, which product, which load. A spindle runs hotter on a hard material, which isn't a fault.
  • Failure history. To predict failures, a model needs examples of them. Well-run plants have few, so this takes time to build.
  • A maintenance process that acts on alerts: work orders, spare parts and a planned stop.

Example: a compressor bearing

A plant's main air compressor has a vibration sensor on the motor bearing. Its normal velocity reading sits around 2 mm/s. Over three weeks the trend climbs:

Week   RMS velocity (mm/s)   Status
 1     2.1                   Normal
 2     2.9                   Rising trend
 3     4.4                   Alert: above plant limit of 4.0

The alert creates a work order. The maintenance team orders the bearing, checks it with a handheld analyser and replaces it during the Sunday shutdown. The compressor never stops unexpectedly, and the plant avoids running all its pneumatic lines on a standby unit. Nothing in this example needs machine learning. A trend and an agreed limit did the job. Models add value later, for example by combining several signals or estimating remaining useful life, once there is enough history to test them against.

Common mistakes

  • Starting with AI before data. Without failure history, models raise alerts nobody trusts. Start with condition monitoring.
  • Monitoring everything. Begin with the few assets whose failure stops production or is expensive to fix.
  • Alerts with no owner, so warnings pile up and nobody plans the repair.
  • Treating generative AI as prediction. An LLM assistant can search manuals and maintenance logs. It doesn't predict a bearing failure. Good maintenance data also improves OEE by cutting breakdown losses. Our manufacturing industry outlook covers when predictive maintenance pays off and when condition monitoring is the honest first step.

Any idea in mind? Let's make it real.

Tell us what you're building. You'll hear back from an engineer, not a sales team, usually within one working day.

Book a 30-min call