Under a time and materials contract, you buy effort rather than a fixed result. The supplier agrees a rate for each role, such as senior engineer, QA or designer, and bills for the time logged. "Materials" covers other approved costs passed through at actual cost: software licences, cloud usage on the supplier's account, devices or travel. You control what the team works on, and you carry the risk that the work takes longer than expected.
How it works in software projects
- The statement of work lists roles, rates, expected team size and any cap.
- Work runs in short cycles, usually two weeks, against a backlog the client prioritises.
- The team logs time against work items.
- The supplier invoices monthly with a timesheet report.
- Both sides review burn against budget at each cycle.
Example: a capped T&M sprint plan
A product team agrees T&M with a cap of 1,600 hours for an MVP. One two-week sprint looks like this:
Role People Hours each Hours
Senior engineer 2 80 160
Engineer 1 80 80
QA engineer 1 40 40
Product designer 1 24 24
Sprint total 304
Cumulative after sprint 3 912 of 1,600 cap (57%)
Budget alert at 75% of cap 1,200 hours
The invoice is the hours per role multiplied by each role's agreed rate. When the team reaches the alert at 1,200 hours, the client and supplier compare the remaining backlog with the remaining hours and decide what to cut, using the MoSCoW priorities. Above the cap, the supplier needs written approval to bill more.
Time and materials vs fixed price
| Time and materials | Fixed price | |
|---|---|---|
| You pay for | Time actually worked | An agreed scope |
| Estimate risk | Mostly the client | Mostly the supplier |
| Changing scope | Easy: reprioritise the backlog | Change requests and renegotiation |
| Budget certainty | Lower, unless capped | High for the defined scope |
| Upfront specification | Light | Detailed |
| Suits | Evolving products, ongoing development, AI work | Clear, stable scope, often after a discovery phase |
Many projects use both: a fixed-price discovery, then capped T&M or fixed price per milestone for the build.
T&M vs cost-reimbursable contracts
In a cost-reimbursable (cost-plus) contract, the buyer pays the supplier's actual costs plus a fee. T&M sits between that and fixed price. The hourly rates are fixed and already include overhead and profit, but the number of hours is open. US federal rules show the same thinking: FAR 16.601 allows a T&M contract only when the extent or duration of the work can't be estimated with confidence, and requires a ceiling price that the contractor exceeds at its own risk.
How to keep T&M under control
- A cap or not-to-exceed amount per SOW or phase.
- Budget alerts at agreed thresholds.
- Weekly reports of hours against work items.
- A product owner on your side who sets priorities each cycle.
- The right to change team size with notice.
T&M works best with an engaged client and a supplier that reports openly. Our comparison of fixed price vs time and materials covers the clauses to include in each model.