Product requirements document template

A free product requirements document template with goals, success metrics, a requirements table, non-functional requirements, a release plan and sign-off.

FreeNo sign-upUpdated

The template · free to copy and edit

Product Requirements Document: [Product or feature name]

Fill in each section, replace the text in [square brackets] and delete the tips when you're done. Keep it short: a page of clear decisions beats ten pages of wishes. This template is from indi.technology/tools/product-requirements-document-template and is free to use and edit.

1. Document information

Field Detail
Product or feature [Name]
Owner [Name, role]
Contributors [Design, engineering, data, legal, support]
Status [Draft / In review / Approved / Superseded]
Version [0.1]
Last updated [Date]
Target release [Month or quarter]
Links [Designs, research notes, technical design, backlog, RFP or SOW]

Tip: Change the version number every time a decision changes, and record why in the decision log (section 15).

2. Problem and context

The problem in one sentence: [Who] struggles to [do what] because [why].

What people do today: [Current workaround, tool or manual process, and what it costs them in time, money or errors.]

Why now: [Customer demand, a regulation, a competitor, a contract, a cost you want to cut.]

Evidence: [Interviews, support tickets, usage data, sales calls. Say how many and when.]

Tip: If you can't name the evidence, write "assumption" and plan how you'll test it. Unproven assumptions belong in section 14 as risks.

3. Goals and non-goals

Goals

  1. [Outcome for users, for example "Customers can complete a claim without calling support"]
  2. [Outcome for the business]
  3. [Outcome for operations or compliance]

Non-goals (not in this release)

  • [Something people will expect, that you've decided not to do now]
  • [A user group you are not serving yet]
  • [A platform, region or language you are leaving out]

Tip: Non-goals prevent more arguments than goals do. Write down anything a stakeholder might assume is included.

4. Success metrics

Metric Today Target By when How it's measured
[Primary metric, for example task completion rate] [Baseline] [Target] [Date] [Analytics event, report or survey]
[Secondary metric] [Baseline] [Target] [Date] [Source]
[Guardrail metric, something that must not get worse] [Baseline] [Limit] [Date] [Source]

Tip: Pick one primary metric. If you don't know the baseline yet, the first task is to measure it.

5. Users and personas

Persona Who they are What they need How often they use it
[Primary user] [Role, context, skill level] [The job they want done] [Daily / weekly / monthly]
[Secondary user] [Role] [Need] [Frequency]
[Admin or internal user] [Role] [Need] [Frequency]

Devices and conditions: [Phone, desktop, tablet. Slow networks, shared devices, field use, low literacy, languages.]

6. User journeys

Journey 1: [Name, for example "First-time user signs up and places an order"]

  1. [User does…]
  2. [System responds…]
  3. [User sees…]
  4. [Journey ends when…]

What can go wrong: [Payment fails, user loses connection, data is missing, user has no permission.]

Journey 2: [Name]

  1. [Step]
  2. [Step]
  3. [Step]

Tip: Describe the journey in the user's words, not as screens. Designers and engineers will turn it into screens. Include at least one unhappy path for each journey.

7. Requirements

ID Requirement Priority Acceptance criteria
R-01 [The user can…] [Must / Should / Later] [Given… when… then…]
R-02 [The system sends…] [Must / Should / Later] [Measurable result]
R-03 [An admin can…] [Must / Should / Later] [Measurable result]
R-04 [Requirement] [Must / Should / Later] [Measurable result]
R-05 [Requirement] [Must / Should / Later] [Measurable result]

Priority meanings

  • Must: the release is not useful or not legal without it.
  • Should: important, but the release can go out without it if time runs short.
  • Later: agreed as valuable, planned for a future release.

Tip: Write each requirement as something a tester can check. "Fast and easy" can't be tested. "The search returns results in under two seconds for 95% of queries" can. Keep IDs stable so designs, tickets and tests can refer to them.

8. Non-functional requirements

Area Requirement How it's verified
Performance [Page or API response time, for example "95% of API calls under 500 ms at expected load"] [Load test, monitoring]
Capacity [Expected users, requests or records at launch and in 12 months] [Load test]
Security [Login method, MFA, roles and permissions, audit logs, OWASP Top 10 testing] [Code review, security test, penetration test]
Privacy [Personal data collected, purpose, consent, retention period, deletion on request] [Data map, privacy review]
Accessibility [Target standard, for example WCAG 2.2 AA; keyboard use, screen readers, colour contrast] [Automated checks, manual audit]
Availability [Uptime target, planned maintenance windows, backup and restore times] [Monitoring, restore test]
Compatibility [Browsers, OS versions, devices, screen sizes] [Test matrix]
Localisation [Languages, currencies, date and number formats, time zones] [Review by native speakers]

Tip: Non-functional requirements decide most of the architecture and a large part of the cost. If you don't know a number, write your best guess and mark it for review.

9. Data and integrations

Data the product stores

Data Contains personal data? Source Retention Who can see it
[User profiles] [Yes / No] [Sign-up form] [Period] [Roles]
[Transactions] [Yes / No] [Source] [Period] [Roles]

Integrations

System Direction Purpose API available? Owner
[Payment provider] [In / Out / Both] [Collect payments] [Yes, documented / No / Unknown] [Name]
[CRM or ERP] [Direction] [Purpose] [Status] [Name]
[Email or SMS provider] [Direction] [Purpose] [Status] [Name]

Data migration: [What existing data moves into the new product, how much, how clean it is, who checks it.]

Tip: Integrations with older systems are where estimates go wrong most often. Ask for API documentation and a test environment before the build starts.

10. Analytics events

Event name Triggered when Properties Used for metric
[signup_completed] [User finishes sign-up] [method, referrer] [Activation rate]
[order_placed] [Order confirmed] [value band, items, payment method] [Conversion rate]
[error_shown] [User sees an error] [screen, error code] [Guardrail]

Tip: Every metric in section 4 should map to at least one event here. Don't send personal data in event properties unless your privacy notice and consent cover it.

11. Design and content

  • Designs: [Link or "to be produced"]
  • Design system or component library: [Name, or "new"]
  • Content owner: [Who writes labels, emails, help text and legal text]
  • Empty, loading and error states: [Designed / to be designed]

12. Release plan

Phase What's included Audience Date Exit criteria
Internal test [Requirement IDs] [Team] [Date] [No open critical bugs]
Pilot or beta [Requirement IDs] [Number and type of users] [Date] [Primary metric trend, feedback]
General release [Requirement IDs] [All users] [Date] [Targets in section 4]

Rollout method: [Feature flag, staged rollout by percentage, app store phased release, region by region.]

Rollback plan: [How you switch it off or revert, and who decides.]

Support and training: [Help articles, support team briefing, sales enablement.]

13. Dependencies

Dependency Owner Needed by Status
[API access from a partner] [Name] [Date] [Not started / In progress / Done]
[Legal review of terms] [Name] [Date] [Status]

14. Risks and open questions

Risks

Risk Likelihood Impact Mitigation Owner
[Users don't trust the new flow] [Low / Medium / High] [Low / Medium / High] [Pilot with 20 users first] [Name]
[Partner API is slower than expected] [Level] [Level] [Mitigation] [Name]

Open questions

# Question Owner Due Answer
Q1 [Question] [Name] [Date] [Answer, once known]
Q2 [Question] [Name] [Date] [Answer]

Tip: An open question without an owner and a date stays open. Close them before the build starts, or turn them into explicit assumptions.

15. Decision log

Date Decision Options considered Reason Decided by
[Date] [What was decided] [A, B, C] [Why] [Name]
[Date] [Decision] [Options] [Reason] [Name]

16. Sign-off

Role Name Decision Date
Product owner [Name] [Approved / Changes requested] [Date]
Engineering lead [Name] [Approved / Changes requested] [Date]
Design lead [Name] [Approved / Changes requested] [Date]
Business sponsor [Name] [Approved / Changes requested] [Date]
Security or compliance [Name] [Approved / Changes requested] [Date]

Tip: Sign-off means "this is clear enough to estimate and build", not "this will never change". Changes after sign-off go through the decision log and a new version number.

Edits are saved in this browser only, so you can come back and finish later. Nothing is sent to us. Download a copy to keep it.

How to use the template

A product requirements document (PRD) records what you are building, for whom, and how you'll know it worked. It gives designers, engineers and a development partner the same picture before anyone estimates or writes code.

  1. Copy the template into Word, Google Docs or your wiki with the buttons above.
  2. Write sections 2 to 4 first: the problem, the goals and non-goals, and the success metrics. If you can't fill these in, you're not ready to list features.
  3. Add users, journeys and requirements next. This is where most of the time goes.
  4. Fill in the non-functional requirements, data and integrations with your engineering lead or vendor. Guesses are fine if you mark them.
  5. Agree the release plan and sign off. Then keep the document alive through the decision log.

Delete the tips and any section that doesn't apply. A small feature might need only sections 2, 3, 7 and 12.

How to fill in the hard sections

Success metrics

Choose one primary metric that shows users got value, such as tasks completed or repeat use. Add a guardrail: something that must not get worse, like support tickets or checkout errors. Write today's figure next to each target. If there is no baseline, measuring it becomes the first task. Each metric should map to an event in the analytics section, or nobody will be able to check it after launch.

Requirements and acceptance criteria

Write each requirement as one thing a user or the system can do. Then write the acceptance criteria as a check a tester can run, for example "Given a user with an expired card, when they pay, then they see a clear error and can try another card." Use the priorities strictly. Must means the release fails without it. If more than about half your list is Must, the scope is too big. Our MVP scope checklist helps cut it down.

Keep the IDs (R-01, R-02) stable. Designs, tickets, test cases and the statement of work can then refer to the same item.

Non-functional requirements

These cover speed, security, privacy, accessibility and uptime. They are easy to skip and expensive to add later. Put a number on each one: response times, expected users, uptime target, backup restore time. For accessibility, name a standard such as WCAG 2.2 AA. For privacy, list which personal data you collect, why, and how long you keep it. If you serve users in India, our DPDP checklist for software teams covers what the product needs to support.

Data and integrations

List every system the product talks to and whether it has a documented API and a test environment. Older ERPs, banking systems and in-house tools cause more delays than any feature. Ask the system owner for access before the build starts.

Using the PRD with a development partner

The PRD is the main input to your contract documents. Attach it to your RFP so vendors quote against the same scope. Once you choose a partner, the requirement IDs and acceptance criteria can move straight into the statement of work. For a fixed price you need acceptance criteria for every Must. For time and materials, the priorities matter more, because they decide what gets built first. See fixed price vs time and materials.

Expect a good partner to challenge the document. Questions about edge cases, data volumes and unclear criteria are a sign they have read it properly.

Common mistakes

  • Describing screens instead of problems. Let designers propose the screens. Describe what the user needs to get done.
  • No non-goals. Stakeholders fill silence with assumptions. Write down what's out.
  • Untestable requirements. "Simple", "fast" and "secure" mean different things to each reader.
  • Metrics with no baseline or no event. You can't show improvement on something you never measured.
  • Writing it once. Decisions change during a build. Update the version, the decision log and the affected requirements.
  • Too long. Readers skip long documents. Link to research and designs rather than pasting them in.

Questions and answers.

A PRD describes the problem a product or feature solves, who it's for, what it must do and how success is measured. Product, design and engineering use it to agree scope before building.

As short as it can be while still answering the questions people will ask. A single feature might fit on two pages. A new product with integrations and regulated data might need ten.

The PRD describes what the product must do. A statement of work is a contract document that sets out what a vendor will deliver, by when, at what price and how it will be accepted.

The product owner, the engineering and design leads, and the business sponsor. Add security or compliance if the product handles personal, financial or health data.

Yes. For an MVP, keep the goals narrow, mark most requirements as Should or Later, and focus the success metrics on whether users get value from the core workflow. Our guide to outsourcing an MVP covers the steps around it.